Hover for beforeTap to open
Interiors
Panelled Accent Wall
Panelled Accent Wall — see the full project
Plank Flooring Install
Carpet out, subfloor levelled, then wood-look plank laid with proper expansion gaps, transitions and fresh quarter round at the walls.
Interiors
Three to four days
Greater Tampa Bay Area
Before
After
Drag the handle across the photo. Same camera position, same room — nothing staged between the two shots.
What the job involved
The work, step by step.
- Carpet, pad and tack strip lifted and hauled away
- Subfloor levelled — the step most installs skip
- Plank laid with the correct expansion gap at every wall
- Transitions fitted at doorways so nothing catches underfoot
- Fresh quarter round run and painted
More like this
Other jobs worth a look.
Hover for beforeTap to open
Interiors
Panelled Accent Wall
Panelled Accent Wall — see the full project
Hover for beforeTap to open
Interiors
Home Office Refresh
Home Office Refresh — see the full project
Hover for beforeTap to open
Kitchens
Full Kitchen Makeover
Full Kitchen Makeover — see the full project
Same idea, your house
Want this result?
Send a photo of the space as it stands and you'll get a realistic, itemised price for work like this — usually back within one business day.
(727) 483-4882
donte@johnsons-home-improvement.com
Mon–Sat, 7am – 7pm
Free written estimate
No pressure to book
Insured Florida LLC