Hover for beforeTap to open
Bathrooms
Classic Bathroom Remodel
Classic Bathroom Remodel — see the full project
Tub & Surround Replacement
Old tub and failing surround pulled out, substrate repaired and waterproofed, then a new tub set and tiled floor to ceiling.
Bathrooms
Three to four days
Greater Tampa Bay Area
Before
After
Drag the handle across the photo. Same camera position, same room — nothing staged between the two shots.
What the job involved
The work, step by step.
- Old tub and cracked surround removed
- Substrate cut back to sound material and repaired
- Waterproofing applied over the whole wet area
- New tub set level and plumbed
- Surround tiled floor to ceiling, grouted and sealed
More like this
Other jobs worth a look.
Hover for beforeTap to open
Bathrooms
Classic Bathroom Remodel
Classic Bathroom Remodel — see the full project
Hover for beforeTap to open
Bathrooms
Full Bathroom Rebuild
Full Bathroom Rebuild — see the full project
Hover for beforeTap to open
Bathrooms
Bathroom Refresh
Bathroom Refresh — see the full project
Same idea, your house
Want this result?
Send a photo of the space as it stands and you'll get a realistic, itemised price for work like this — usually back within one business day.
(727) 483-4882
donte@johnsons-home-improvement.com
Mon–Sat, 7am – 7pm
Free written estimate
No pressure to book
Insured Florida LLC