Hover for beforeTap to open
Bathrooms
Classic Bathroom Remodel
Classic Bathroom Remodel — see the full project
Bathroom Refresh
No demolition needed — new fixtures, fresh paint, updated hardware and re-caulked joints brought a serviceable bathroom back to looking new.
Bathrooms
Two days
Greater Tampa Bay Area
Before
After
Drag the handle across the photo. Same camera position, same room — nothing staged between the two shots.
What the job involved
The work, step by step.
- Existing tile and tub checked over and kept
- Dated fixtures swapped for new
- Walls and trim repainted
- Hardware, towel bars and fittings updated
- Every joint cut out and re-caulked
More like this
Other jobs worth a look.
Hover for beforeTap to open
Bathrooms
Classic Bathroom Remodel
Classic Bathroom Remodel — see the full project
Hover for beforeTap to open
Bathrooms
Full Bathroom Rebuild
Full Bathroom Rebuild — see the full project
Hover for beforeTap to open
Bathrooms
Tub & Surround Replacement
Tub and Surround Replacement — see the full project
Same idea, your house
Want this result?
Send a photo of the space as it stands and you'll get a realistic, itemised price for work like this — usually back within one business day.
(727) 483-4882
donte@johnsons-home-improvement.com
Mon–Sat, 7am – 7pm
Free written estimate
No pressure to book
Insured Florida LLC