Hover for beforeTap to open
Bathrooms
Classic Bathroom Remodel
Classic Bathroom Remodel — see the full project
Full Bathroom Rebuild
Taken back to the studs so the waterproofing and framing could be done properly, then rebuilt with new tile, vanity, lighting and fixtures.
Bathrooms
Around two weeks
Greater Tampa Bay Area
Before
After
Drag the handle across the photo. Same camera position, same room — nothing staged between the two shots.
What the job involved
The work, step by step.
- Room stripped back to the studs so nothing was hidden
- Framing repairs made where the old leak had reached
- Waterproofing membrane run before a single tile went on
- Tile set on floor and walls, then grouted and sealed
- Vanity, lighting, mirror and fixtures fitted and tested
More like this
Other jobs worth a look.
Hover for beforeTap to open
Bathrooms
Classic Bathroom Remodel
Classic Bathroom Remodel — see the full project
Hover for beforeTap to open
Bathrooms
Bathroom Refresh
Bathroom Refresh — see the full project
Hover for beforeTap to open
Bathrooms
Tub & Surround Replacement
Tub and Surround Replacement — see the full project
Same idea, your house
Want this result?
Send a photo of the space as it stands and you'll get a realistic, itemised price for work like this — usually back within one business day.
(727) 483-4882
donte@johnsons-home-improvement.com
Mon–Sat, 7am – 7pm
Free written estimate
No pressure to book
Insured Florida LLC