Full Bathroom Rebuild

Taken back to the studs so the waterproofing and framing could be done properly, then rebuilt with new tile, vanity, lighting and fixtures.

Bathrooms Around two weeks Greater Tampa Bay Area
Full Bathroom Rebuild after the work — a finished bathroom with new tile, vanity and fixtures
The same view before — a stripped bathroom down to the studs
Before After

Drag the handle across the photo. Same camera position, same room — nothing staged between the two shots.

What the job involved

The work, step by step.

  • Room stripped back to the studs so nothing was hidden
  • Framing repairs made where the old leak had reached
  • Waterproofing membrane run before a single tile went on
  • Tile set on floor and walls, then grouted and sealed
  • Vanity, lighting, mirror and fixtures fitted and tested

More like this

Other jobs worth a look.

All transformations

Same idea, your house

Want this result?

Send a photo of the space as it stands and you'll get a realistic, itemised price for work like this — usually back within one business day.

(727) 483-4882

donte@johnsons-home-improvement.com

Mon–Sat, 7am – 7pm


Free written estimate

No pressure to book

Insured Florida LLC

Call Free estimate